ASBESTOS MANAGEMENT

Picture 1 Picture 1 sectional pipe lagging Damaged AIB panels asbestos spray coating Boiler Room hand applied lagging asbestos paper Damaged Asbestos Cement Profiled Sheet

 

Providing Solutions

 

 

 

Tel: 01904 658989

 

Mob: 07760 767631

 

 

 

 

 

 

e-mail:

ask@pageasbestos.co.uk

 

 

 

 

 

 

Page Asbestos Services Ltd

 

33 Vesper Walk

 

York

 

YO32 9SZ

 

 

Remediation Project Management

Organising for Asbestos Remediation on your premises can be time consuming and problematic if you're not used to it.

 

How we help:

 

Come to an initial agreement on the best way to deal with the Asbestos Containing Material (Encapsulation; Enclosure; Removal) taking into account the current condition of the material and also the future likelihood of disturbance.

 

Draw up a 'Scope of Works' to enable quotes from contractors to be judged on a like for like basis. Following contractor selection, all Certificates, Risk Assessments and Method Statements/Plans of Work (including Emergency Procedures) are checked.

 

Being present during the site set-up and witnessing the 'Smoke Test', followed by regular inspections through the life of the Project to ensure the work is being carried out in accordance with the Plan of Work, and at the end, being present for the 4-Stage Clearance before handing back the site.